Prado Dam Phase II
Contract Amount:
$11.5 Million
Owner:
US Army Corps of Engineers
Delivery Method:
Design Bid Build
Scope of Work:
- Over 1 million cubic yards of new earthern embankment and slope stabilization
- 1000-foot concrete floodwall
- Concrete box culvert
- Concrete drainage ditch
- Rip-rap
Contract Amount:
$11.5 Million
Owner:
US Army Corps of Engineers
Delivery Method:
Design Bid Build
|
|