Tempe Meter Vaults
Contract Amount:
$676,751
Owner:
City of Tempe
Delivery Method:
Job Oder Contract
Scope of Work:
- Install large diameter water meter in precast concrete vaults
- Structural excavation
- Backfill
- Structural concrete
- Precast concrete vaults
- Asphalt paving
- Remove and replace concrete sidewalk
- Pipe taps
- Electrical trenching
- Instruments and controls
- Traffic controls
Contract Amount:
$676,751
Owner:
City of Tempe
Delivery Method:
Job Oder Contract
