US 54 Overpass
Contract Amount:
$4.7 Million
Owner:
USACE
Delivery Method:
Design Bid Build
Scope of Work:
- Construction of a bridge (overpass) across the top of the US 54 highway and the Union Pacific Railroad tracks North of Fort McGregor Base Camp in Southern New Mexico
- MSE walls
- PCCP paving
- Grading
- Concrete flatwork
- Fencing and guardrail
- Striping
- Signage
- Rip-rap
- Storm drain pipe
Contract Amount:
$4.7 Million
Owner:
USACE
Delivery Method:
Design Bid Build
